Jump to main content

Technical capacity and physical flow

 

 

 

 

     

Detail of an Enagás regasification plant

Access daily monitoring of the system

Photo detail of gas pipeline

View the Operation Plan

 

International connection Importation technical capacity (KWh/d)Exportation technical capacity (KWh/d)
I.C. Almería338,000,0000
I.C. Tarifa444,000,00032,000,000
VIP Ibérico80,000,000144,000,000
VIP Pirineos225,000,000225,000,000

 

 

LNG terminalNominal capacity of regasification (KWh/d)Nominal load capacity of truck tanks (KWh/d)
Barcelona 544,284,00017,402,700
Sagunto278,977,33310,500,00
Cartagena376,812,00017,402,700
Huelva376,812,00017,402,700
Bilbao223,296,0005,100,000
Mugardos115,220,73610,500,000

 

* Enagás accepts no responsibility for any changes, alterations, errors or omissions in the information after publication. The data published are for information purposes only