These connection applications will be managed annually, through a bidding procedure, which will consist of three phases.
This page provides you with information on the capacity allocation procedure for connecting hydrogen production projects to the natural gas transmission network. This procedure is mandatory for all companies with a hydrogen production plant that wish to connect to the natural gas network.
Circular 2/2025 of the CNMC (National Commission for Markets and Competition in Spain) and the Resolution of 13 June 2025 set out a bidding process, structured in phases, to allocate available capacity in a transparent, orderly and objective manner.
These connection applications will be managed annually, through a bidding procedure, which will consist of three phases.
*The dates provided are indicative and may be subject to change depending on the circumstances outlined in the Resolution of 13 June 2025, as well as the application of non-working days under Circular 2/2025.
Applications may not be filed by network operators that have not been previously submitted in phase 1 to Enagás GTS by filling in the relevant form.
Developers must formalise their connection applications to the corresponding network owners, who will evaluate and provisionally assign the available capacity together with the Gas System Technical Manager.
Evaluation and allocation:
Operators shall communicate the final results of their analysis to the applicant companies upon completion of the assessment and verification process. Enagás GTS will publish the final allocated capacity on this page.