Our infrastructure maintenance plan

 

The annual maintenance plan includes special operations and works on gas pipelines and other infrastructure. It also describes corrective maintenance and unscheduled works on infrastructure.

In addition to viewing the various updates made to the plan, you can also download a report on the impact of maintenance on capacity at cross-border interconnection points, in accordance with Regulation (EC) No. 715/2009 and ENTSOG.

 

Capacities are expressed under the following reference conditions: [GCV at 0ºC; V (0ºC, 1.01325 bar)]. According to Appendix J of ISO 6976 the factor applied for converting GCV from 0ºC to 25ºC shall be 1/1.0026.