Herramientas

  • Home
  • En Español
  • Contacto_en
  • Map
  • RSS

Menú de navegación principal



Technical Management of the System

SL-ATR Access

Print

In compliance with the detailed protocol PD-04 "Communications Mechanisms", GTS offers to the Gas System agents a fluid real-time communication tool between them, which supports the full cycle gas management: capacity request, contracts, programmings and nominations, measurements, distributions, balances and billing support.
This system is the SL-ATR (Logistics System for Third Party Access to the Network).

Here you can view and download the SL-ATR configuration manual which includes the technical requirements needed to access to the system. It also has direct access to the system.



  • SL-ATR configuration manual
    Document in PDF (It will be opened in a new window) Download pdf 649 Kb  /   21/03/2013
Install Adobe ReaderInstall Adobe Reader
Go to top


Icon conforms with Level AA of the 1.0 Web Content Accessibility Directives of the W3C-WAI