TECHNICAL MANAGEMENT OF THE SYSTEM
In this section, it is available the update of the physical exports and imports, through the interconnecting points of: Badajoz/Campo Maior and Tuy/Valença do Minho from July 1, 2011 up to December 31, 2015. These capabilities have been calculated and agreed by the Spanish and Portuguese TSOs (Technical System Operators)
Copyright 2006 © Enagás S.A. Paseo de los Olmos, 19 28005 Madrid Tlf. 902 443 700 / (+34) 91 709 92 00






