On 30 July 2010, the Directorate General of Energy Policy and Mines issued a new ruling stating that, from November 1st 2010 on, carriers must make unused contracted and backhaul capacity available to international connections on an interruptible basis, once the maximum contracting/available capacity is used up.
Here you can download the following documents.
You can download these files in PDF format. To view them, Adobe Reader is required. You can install it for free from this page.
Copyright 2006 © Enagás S.A. Paseo de los Olmos, 19 28005 Madrid Tlf. 902 443 700 / (+34) 91 709 92 00