Gas Transmission

Open Season

Print

Open Season 2015 Results


With regard to the process of the OS2015 and as stated in Chapter 4 of the Information Memorandum, on July 16 Enagás reported the result to companies that submitted requests for capacity.

The same day, the CNE issued a press release on this process, which can be accessed via the attached link.


  • South Gas Regional Initiative: Open season 2015 increases the gas interconnection capacity between Spain and France at Irun/Biriatou
    Document in PDF (It will be opened in a new window) Download pdf 59 Kb  /   16/07/2010
Install Adobe ReaderInstall Adobe Reader
Go to top


Icon conforms with Level AA of the 1.0 Web Content Accessibility Directives of the W3C-WAI