Herramientas

  • Home
  • En Español
  • Contacto_en
  • Map
  • RSS

Menú de navegación principal



Technical Management of the System

Gas System Operation

Print

Winter Operations


Here you can consult the Winter Action Plan, the definition criteria of a cold wave and the Demand Coverage Plan. You can also find the conclusions on the Gas System Behaviour in the last winter periods, in regards to demand, facilities' capacity and compliance with operation regulations.

Choose a category: You can download the file in PDF format. To view it, you will need Adobe Acrobat Reader, which you can install for free from this page.

Capacities are expressed under the following reference conditions: [GCV at 0ºC; V(0ºC, 1.01325 bar)]. According to Annex J of ISO 6976 the factor applied for converting the GCV from 0ºC to 25ºC shall be 1/1.0026.

These documents are currently only available in Spanish. We apologise for any inconvenience.

  • 11/10/2012 New Winter 2012-2013. Winter Outlook Report GTS 2012-2013
    pdfDownload pdf 1Mb

Install Adobe Reader Install Adobe Reader
subir


Icon conforms with Level AA of the 1.0 Web Content Accessibility Directives of the W3C-WAI