Secure Access, It will be opened in a new window

Herramientas

Menú de navegación principal



Gas Transmission

Transport Logistics Management

Print

Transport Management


On this page you can download the monthly operations plan of Enagás infrastructures, which is updated daily, with the following content:

null  
  • Gas movements, inventories and production in each Enagás plant
  • Transport entries in the Enagás infrastructure
  • Autonomy in Enagás regasification plants
  • Utilisation of Enagás infrastructures
  • Enagás plant inventories, where details are provided on the physical inventories’ equivalent in days, with respect to the contracting of each plant and the net physical inventory (physical inventories minus the equivalent of two days of contracting)

Enagás Huelva Plant


pag:

  • October 2010. Report Operations Plan of Enagás Infrastructures
    pdf Download pdf 89Kb  /  28/08/2010
  • September 2010. Report Operations Plan of Enagás Infrastructures
    pdf Download pdf 91Kb  /  07/09/2010
  • August 2010. Report Operations Plan of Enagás Infrastructures
    pdf Download pdf 91Kb  /  31/08/2010
  • July 2010. Report Operations Plan of Enagás Infrastructures
    pdf Download pdf 91Kb  /  31/07/2010
  • June 2010. Report Operations Plan of Enagás Infrastructures
    2010I 
    pdf Download pdf 93Kb  /  30/06/2010
  • May 2010. Report Operations Plan of Enagás Infrastructures
    2010I 
    pdf Download pdf 94Kb  /  31/05/2010

pag:

Install Adobe Reader Install Adobe Reader
Go to top


Icon conforms with Level AA of the 1.0 Web Content Accessibility Directives of the W3C-WAI