Technical Management of the System

Gas System Operation

Print

Programming and Nomination


The monthly Operation Plans, as a result of the Monthly Forecasts Process (Initial and Second Monthly Operation Plan), and the information before April 2010, before April 2010, can be viewed on this page. Each four-page document contains the following daily data:

null

  • The movement of LNG in regasification plants. Storage tank levels, production and deliveries are shown for each regasification plant.
  • The Transport System. Detailed entries can be viewed classified by regasification plant, international connections, gas field and underground storage facility. It details exits by transport network, split by conventional market and electric sector, and cisterns can also be viewed.
  • The details of Transport System by area. The informartion displayed is divided in conventional and electric demand.
  • The inventories in tanks, transport network and underground storage facilities. Data is provided on inventory in underground storage facilities –both usable inventory and in operation–,in the transport network, and in LNG tanks. The number of equivalent days of autonomy in plants regarding actual-planned production is also accesible.


The monthly Operation Plans (OP), which are updated daily (current month and next) with information after March 2010, are available in Operation Plan of the System.

In addition, Considerations to the Monthly Operation Plan are available in Considerations: Programming and Nomination.

Microsoft Excel is required to access this software.

Enagás S.A. cannot be held responsible for any changes, amendments, errors or omissions once this information is published. This data is for information purposes only.

Capacities are expressed under the following reference conditions: [GCV at 0ºC; V(0ºC, 1.01325 bar)]. According to Annex J of ISO 6976 the factor applied for converting the GCV from 0ºC to 25ºC shall be 1/1.0026.

These documents are currently only available in Spanish. We apologize for any inconvenience.


Programming and Nomination


pag:

  • 24/04/2014 New June 2014. Second Monthly Operating Plan
    excelDownload Excel 438Kb
  • 24/04/2014 New May 2014. Inicial Operating Plan
    excelDownload Excel 440Kb
  • 26/03/2014 New May 2014. Second Monthly Operating Plan
    excelDownload Excel 440Kb
  • 26/03/2014 New April 2014. Inicial Operating Plan
    excelDownload Excel 438Kb
  • 25/02/2014 New April 2014. Second Monthly Operating Plan
    excelDownload Excel 438Kb

pag: